Posted in Article 6. (DONE, kelly, paid, 10 mins) to-do: unwrap 4 chairs, water into cabinet, filing cabinet to behind-boat 2025-06-28 Leave a Comment on 6. (DONE, kelly, paid, 10 mins) to-do: unwrap 4 chairs, water into cabinet, filing cabinet to behind-boat 1. unwrap 4 chairs; stack in front of bbq for now.2. water into cabinet under fridge3. move the 2-drawer filing cabinet to behind boat