Despite the impact, results of the ongoing analysis indicate that the arm’s performance remains unaffected. The damage is limited to a small section of the arm boom and thermal blanket. Canadarm2 is continuing to conduct its planned operations, including hoisting Dextre into position to replace a faulty power switchbox (Remote Power Control Module).
Source: International Space Station news


